version control - Should I submit unchanged files to Perforce? -


i'm using perforce integrate 2 codelines. in resulting changelist, there files marked opened integration, have not changed.

should submit these unchanged files or should revert them?

i want revert them because don't want these unchanged files pollute changelist.

but, if submit them, have feeling perforce might have use of "fact" (that files have been integrated) future integration.

yes, should submit them. create integration record record changes have been "integrated" (which may not mean actual changes occurred on target).


Comments

Popular posts from this blog

java - SNMP4J General Variable Binding Error -

windows - Python Service Installation - "Could not find PythonClass entry" -

Determine if a XmlNode is empty or null in C#? -